[12] Patent
[11] Patent No.:GC0013776  
[45] Date of Publishing the Grant of the Patent: 9/Sep /2025                102/2025  
Number of the Decision to Grant the Patent:2025/203302
Date of the Decision to Grant the Patent:05/Aug/2025

[21] Application No.:GC 2019-38819

[22] Filing Date:12/12/2019

[30] Priority:

[33] State [32] Priority date [31] Priority No.
US
13/12/2018
16/219,906

[72] Inventor: Gerard O’Hora

[73] Owner: SynCells, Inc., 800 Boylston Street, Suite 1600, Massachusetts, USA

[74] Agent: Abu-Gazaleh Intellectual Property L.L.C

  

 

  

[51]IPC:
Int. Cl.: G05B 11/01; G06F 1/26; G06F 1/28; H02J 3/14 (2006.01)

[56] Cited Documents:

-US 20130166081 A1 (SUNVERGE ENERGY, INC.) 27 June 2013
-US 20160202686 A1 (INTERNATIONAL BUSINESS MACHINES CORPORATION) 14 July 2016
-US 20180144414 A1 (ADVANCED MICROGRID SOLUTIONS, INC.) 24 May 2018
-US 20120226592 A1 (FLYNN) 06 September 2012
-WO 2018231932 A1 (SYNCELLS, INC.) 20 December 2018
 
Examiner: Eng. Ghassan F. AlBuhairan

[54] ENERGY VIRTUALIZATION LAYER WITH A UNIVERSAL SMART GATEWAY
[57] Abstract: An energy virtualization system may include a physical interface gateway that may include a plurality of common interfaces. The plurality of common interfaces may be coupled to a plurality of energy-producing devices, a plurality of energy-control devices, and a plurality of energy-consuming devices. The system may also include a building network, where the plurality of energy-producing devices, the plurality of energy-control devices, and the plurality of energy consuming devices can communicate through building network. The system may additionally include a computing device running an energy virtualization layer. The virtualization layer may include a plurality of virtual devices representing the plurality of energy-producing devices, the plurality of energy-control devices; and the plurality of energy-consuming devices. The virtualization layer may also direct energy from the energy-producing devices to the energy consuming devices according to information received from the energy-control devices.
No. of claims: 20     No. of figures: 14


 

Note: Any interested individual may, within 3 months of publication of the grant, file objection thereof with the Grievance Committee after payment of grievance fees.