[12] Patent
[11] Patent No.:GC0009491  
[45] Date of Publishing the Grant of the Patent: 31/Dec /2018                56/2018  
Number of the Decision to Grant the Patent:2018/142521
Date of the Decision to Grant the Patent:31/Dec/2018

[21] Application No.:GC 2013-24648

[22] Filing Date:12/6/2013

[30] Priority:

[33] State [32] Priority date [31] Priority No.
US
US
14/6/2012
10/4/2013
61/659.541
61/810.339

[72] Inventors:1- Narasimhan SUNDARAM،2- Ramesh GUPTA،3- Hans THOMANN،4- Hugo S. CARAM،5- Loren K. STARCHER،6- Simon C. WESTON،7- Scott J. WEIGEL،8- Franklin F. MITTRICKER

[73] Owner: ExxonMobil Research and Engineering Company, 1545 Route 22, East, NJ 08801-0900 , Annandale, USA

[74] Agent: Suleiman I. Al-Ammar Law Office

  

 

  

[51]IPC:
Int. Cl.: B01D 53/047; F02C 1/00, 3/34, 6/18 (2006.01)

[56] Cited Documents:

-US 2012125194 A1 (CARAM HUGO S [US]; LACAVA ALBERTO I [US]) 24 May 2012  
Examiner: Rami Al-Ghamdi

[54] INTEGRATION OF PRESSURE SWING ADSORPTION WITH A POWER PLANT FOR CO2 CAPTURE/UTILIZATION AND N2 PRODUCTION
[57] Abstract: Systems and methods are provided for combined cycle power generation while reducing or mitigating emissions during power generation. Recycled exhaust gas from a power generation combustion reaction can be separated using a swing adsorption process so as to generate a high purity CO2stream while reducing/minimizing the energy required for the separation and without having to reduce the temperature of the exhaust gas. This can allow for improved energy recovery while also generating high purity streams of carbon dioxide and nitrogen.
No. of claims: 19     No. of figures: 6


 

Note: Any interested individual may, within 3 months of publication of the grant, file objection thereof with the Grievance Committee after payment of grievance fees.