[12] Patent
[11] Patent No.:GC0009312  
[45] Date of Publishing the Grant of the Patent: 31/Dec /2018                56/2018  
Number of the Decision to Grant the Patent:2018/141271
Date of the Decision to Grant the Patent:10/Dec/2018

[21] Application No.:GC 2014-28337

[22] Filing Date:18/11/2014

[30] Priority:

[33] State [32] Priority date [31] Priority No.
US
21/11/2013
14/085,955

[72] Inventors:1- Suresh SHENOY،2- Jay Brian ANDERSON،3- Rahul J. TERDALKAR،4- Donald William BAIRLEY

[73] Owner: General Electric Technology GmbH, Brown Boveri Strasse 7, 5400 , Baden, Switzerland

[74] Agent: Abu-Gazaleh Intellectual Property L.L.C

  

 

  

[51]IPC:
Int. Cl.: F22B 15/00, 35/14 (2006.01)

[56] Cited Documents:

-US 20120180739 A1 (ROP PETER SIMON?[NL] KRAMER WALTER ADRIAAN?[NL]) 19 July 2012
-US 6957630 B1 (ALSTOM TECHNOLOGY LTD?[CH]) 25 October 2005
 
Examiner: Eng. Ghassan F. AlBuhairan

[54] EVAPORATOR APPARATUS AND METHOD OF OPERATING THE SAME
[57] Abstract: A heat exchanger apparatus for receiving water from a steam drum (1) and providing steam and heated unevaporated liquid water to the steam drum includes a first evaporator (EVAP-1) and a second evaporator (EVAP-2). The first evaporator can receive water from a steam drum via a first feed conduit (9) and the second evaporator can receive water from a second feed conduit (11). Both evaporators can output heated fluid to the steam drum via a combined evaporator output conduit (13). Each first evaporator passageway (14) only makes a single pass through a gas duct (15) having a heated gas flow (7) passing therethrough while each second evaporator passageways (24) can make one or more passes through the gas duct for transferring heat from the gas to the fluid within the evaporators. A portion of the first feed conduit can also have a pre-specified volume a pre-specified height below the first inlet (10).
No. of claims: 20     No. of figures: 3


 

Note: Any interested individual may, within 3 months of publication of the grant, file objection thereof with the Grievance Committee after payment of grievance fees.